GN Solids Control took a Portable mud recycling system to Australia trenchless 2011 show with great success .So we will take part in two shows in Australia in 2012 and 2 mud recycling system is for sale that bring to Australia show
GN has already sold over USD 2,500,000 mud recycling system& equipments or spares to Australia for the drilling industry.
GN Mud recycling system have been designed, engineered, built and tested by professionals.GN can manufacture a complete line of equipment for HDD(Horizontal Directional Drilling ) and CBM ( Coal Bed Methane ) and water well,Mining and geothermal well drilling mud recycling system
How GN mud recycling system work
The first process is with the use of a shaker screen. When the mud is drawn from the hole it is first discharged onto a fine mesh, which constantly moves from side to side spreading the mixture across it. This allow the drilling fluid to fall through whilst larger items such as rocks and cutting remain on the mesh until they are shaken off its bottom edge and removed from the system.
10 mesh screens are fitted as standard, however there are different sizes of mesh which can fitted appropriate to type of drilling fluid being used and formations being drilled.
The second process starts as the drilling fluid falls from the first mesh into the reservoir tank. The specially designed sloped tank causes a swell in the water, causing some sediment to drop and get caught in the sand traps, whilst the remaining fluid cascades over the dividing wall from where it is pumped into the desander cones. Under correct pressure and flow the cones remove as much sand as possible before discharging the sand onto a much finer shaker screen, where again anything larger then the fluid itself stays in the screen and is removed from the system, whilst the drilling fluid falls through this and the original screen back into the reservoir tank.